Dwarka Expressway property belt
Sectors 102–113 and adjoining sectorsA west-Gurugram apartment, plotted and commercial corridor where sector, phase and present approach road matter more than the expressway label alone.
StatusOfficial planning and map sources linked
Buyer checkMatch the exact project phase on Haryana RERA and trace today’s all-weather access on GMDA OneMap.
New Gurugram sectors 81–95
NH-48–Dwarka Expressway–Manesar beltA large mixed housing belt with group housing, DDJAY plots and neighbourhood commercial sites across multiple licensed phases.
StatusOfficial development-plan source linked
Buyer checkVerify the sector, licence, RERA phase, possession position and completed sector-road access separately.
Golf Course Extension Road belt
Sectors 58–67AA premium apartment and office corridor where incomplete internal links, drainage and project-level access can still differ by sector.
StatusOfficial plan and buyer-risk guide linked
Buyer checkInspect the existing route at peak time and after rain; treat a proposed 24-metre link as future potential, not present access.
Sohna Road urban belt
Sectors 47–57 and Badshahpur sideAn established housing and commercial corridor with mature pockets, redevelopment and sharp differences between sector, colony and revenue-estate records.
StatusOfficial collector-rate and plan sources linked
Buyer checkUse the correct Gurugram or Badshahpur schedule and compare the exact colony, road and land use—not a broad Sohna Road average.
24-metre road-gap check
Sectors 58–67AThe first reported priority package includes about 27.1 acres in this sector group for missing planned road links.
StatusSurvey stage—not completed roads
Buyer checkAsk for the exact road strip, ownership and present stage: survey, notification, possession, tender or construction.
Sector 81 road-gap check
Sector 81About 10.7 acres were reported in the initial priority examination for missing 24-metre road links in Sector 81.
StatusSurvey stage—not completed road
Buyer checkValue the property using access available today and verify the missing link on the sector plan before relying on it.
HSVP use and plan check
HSVP sectors 1–23Residential-use and sanctioned-building-plan compliance can affect a resale house even when the street contains other commercial activity.
StatusEnforcement records must be checked per plot
Buyer checkObtain the sanctioned plan, occupation certificate and every HSVP or utility notice before paying a token.
HSVP use and plan check
HSVP sectors 24–57An address in an established sector does not by itself establish that additions, subdivisions or professional use comply with the approved record.
StatusEnforcement records must be checked per plot
Buyer checkCompare every floor and basement with the sanctioned plan and confirm any permitted professional use in writing.
Drainage and sewer-outfall check
Project-specific across GurugramCity trunk-drain projects do not prove that a specific society has a completed internal connection or flood-safe basement access.
StatusVerify on site; conditions vary street by street
Buyer checkVisit after rain, trace the sanctioned outfall and inspect basement pumps, road levels and sewer separation.
Gurugram collector-rate schedule
Gurugram tehsilThe district publishes separate final schedules; the correct row depends on the exact sector, colony, category and road position.
StatusFinal 2026–27 schedule
Buyer checkUse this registration benchmark separately from asking price and recent transaction evidence.
Manesar collector-rate schedule
Manesar tehsil and IMT influence areaManesar has a separate official schedule within the Gurugram district release and should not be priced from a central-Gurugram row.
StatusFinal 2026–27 schedule
Buyer checkMatch the exact revenue estate and land use, then check whether the site is industrial, residential, commercial or agricultural.
IMT Kharkhoda industrial township
KMP-adjoining industrial beltHSIIDC says the township was planned in 2013 and its published layout contains 2,528 industrial plots, with 1,083 shown allotted on the estate profile.
StatusOfficial HSIIDC estate profile
Buyer checkIndustrial-allotment figures are not residential inventory or price evidence; check plot category, allotment terms and transfer rules.
Maruti Suzuki Kharkhoda plant
IMT KharkhodaThe manufacturer announced operations at its Kharkhoda automobile plant with an initial annual capacity of 250,000 vehicles.
StatusOperations announced by manufacturer
Buyer checkTreat employment growth as a market driver, not a guarantee of residential appreciation or project approval.
Suzuki motorcycle plant programme
KharkhodaSuzuki’s official programme describes a roughly 100-acre motorcycle plant with scheduled production in 2027 and planned annual capacity of 750,000 units.
StatusOfficial foundation announcement
Buyer checkVerify present construction and access separately; future production does not regularise nearby agricultural plotting.
Kharkhoda town and Sisana Road
Established town–Sisana RoadAn established urban market of houses, local colonies and peripheral land that must be distinguished from IMT industrial plots and private sector colonies.
StatusMapped locality research
Buyer checkMatch municipal/revenue location, approved land use, road category and service availability before comparing rates.
DDJAY plotted-project belt
Sectors 6–11AKharkhoda’s private plotted brands cluster in this planned belt, but each advertised plot must match a licence, RERA phase and sanctioned layout.
StatusNamed projects require phase-level verification
Buyer checkSearch the exact promoter, project and phase on Haryana RERA; do not accept a sector number as approval evidence.
NV City document check
Sector 10APublished project material identifies a 15.14435-acre plotted colony and reports 299 plots; this record does not claim that any plot is currently for sale.
StatusProject identity recorded; current availability unverified
Buyer checkMatch the offered plot to the current RERA certificate, licensed layout, released inventory and registry position.
Kharkhoda collector-rate schedule
Kharkhoda tehsilSonipat district published a separate final schedule for Kharkhoda rather than one blanket district rate.
StatusFinal 2026–27 schedule
Buyer checkUse the exact village, sector, property use and road category; collector rate is not the same as market asking price.
Kharkhoda RERA phase search
All licensed residential projectsProject branding can cover more than one phase or sector. The official search is the primary check for registration number, promoter and declared timeline.
StatusLive official search required before booking
Buyer checkRecord the live RERA number and download the certificate and quarterly updates before discussing a booking amount.